steel factory
Client
Location: steel factory
Hayange, France
Duration: 3 months
Project management: IR Fr.
Equipment
- Electrically driven centrifugal oil-free air compressor 103 m³ / min
- 6 kV connection box
- Transformer from 5500 volts to 400 volts
- Transformer from 400 volts to 6000 volts
recent projects






















Testimonials
On a Friday evening we called the emergency number of the RTC Group and immediately the phone was picked up.
With tremendous fast response time they helped us to get our compressed air production to an acceptable level.
This solution has saved us huge amounts of diesel, pollution and not the least euros.